DESCRIPTION
In March 2020, the COVID pandemic had just begun and hospitals were collapsing due to lack of beds. AC Engineering responded to the request for help from the San Salvatore Hospital in Pesaro with the donation of a structure of about 100 sqm to be used for OBI (Short Intensive Observation) beds, made to measure in the record time of 4 and a half days, complete with systems and ready for use. A demonstration of the adaptability, speed and practicality of the Home Done system.
INFORMATIONS
INFORMATION REQUEST
"*" indicates required fields